IPT Well Solutions, in partnership with Paradigm for Mineral Resources, developed a comprehensive full field development plan for a highly restricted urban drilling location under the city of Greely, CO.
The Challenge: IPT needed to access gas condensate reserves with limited surface drilling locations, requiring long horizontal wells and advanced engineering to avoid failures and wellbore collisions.
The Approach: IPT designed wells up to 17,000′ MD with significant offsets and utilized in-depth engineering analysis, including string design, Torque/Drag analysis, and accurate trajectory planning.
The Solution: Using the Paradigm Sysdrill application, IPT successfully planned and executed multiple well pad patterns, ensuring anti-collision and optimal reservoir placement.
The Results: IPT demonstrated engineering feasibility, successfully drilling and completing the project without any abandoned wells.
For full details, read the case study here.
To learn more about how we can help you with your next project, contact us below!