Workover & Plug and Abandonment (P&A) Services

At IPT Well Solutions, we approach workover and plug & abandonment (P&A) operations with the same level of engineering precision and operational expertise that defines our entire service offering. Whether optimizing well performance through workovers or ensuring safe, regulatory-compliant well abandonment, our team delivers solutions that maximize efficiency while minimizing costs and risks.

Workover: Optimizing Well Productivity

Workovers are a critical part of well lifecycle management. Whether the objective is restoring production, completing a recompletion, or addressing integrity concerns, IPT provides engineering-driven workover strategies that deliver measurable results. Our team evaluates well history, formation characteristics, best stimulation for formation and operational constraints to develop customized plans that enhance well performance while controlling costs.

Our workover expertise includes:

  • Completion modifications – Optimizing completions to extend well life and improve recovery.
  • Tubing and casing repairs – Addressing mechanical integrity challenges with fit-for-purpose solutions.
  • Artificial lift optimization – Enhancing lift systems to improve production efficiency.
  • Zonal isolation and stimulation – Targeting specific intervals to increase productivity.

Plug & Abandonment: Safe, Efficient, and Compliant Solutions

P&A operations demand precision, compliance, and cost control. Improperly abandoned wells pose long-term environmental and financial liabilities, which is why we take a risk-based approach to well abandonment. Our team integrates regulatory compliance, cementing expertise, and well integrity best practices to ensure that every well is properly isolated, eliminating future risks while optimizing cost efficiency.

Our P&A services include:

  • Regulatory compliance and permitting – Ensuring full adherence to local, state, and federal requirements. Submit after plugging reports to state and federal regulatory agency.
  • Custom abandonment design – Engineering P&A procedures tailored to well conditions and operational goals. All plugging services bid out with several services companies.
  • Section milling and cement plug placement – Ensuring long-term wellbore isolation.
  • Risk assessment and liability reduction – Identifying potential failure points to prevent future issues.
  • Experienced well-site supervisors that prepare detailed daily operational and cost reports.


Engineering-Driven Approach to Workover and P&A

At IPT Well Solutions, we don’t take a one-size-fits-all approach. Every well presents unique challenges, and our engineers develop data-backed, cost-effective strategies that align with your operational and financial objectives. From extending the productive life of a well to executing permanent abandonment, we deliver solutions that mitigate risk, control costs, and exceed regulatory standards.

If you need a partner who understands the engineering behind well interventions and abandonments, IPT Well Solutions is ready to support your operation. Let’s ensure your wells are optimized, secure, and compliant—no shortcuts, just smart, effective solutions.

 

To learn more about our comprehensive solutions, speak to one of our experts today.